|
|


FM Global
Waltham, MA
Installed Mechanical Systems & DDC Controls for approximately 1.5 Million square feet of office space. Four of the buildings, which total 800,000 square feet, include Thermal Ice Storage Systems for Off Peak cooling. BAS provides HVAC and Control Service for FM Global.
EMC2 Corporation
Westborough, MA
HVAC Design/Build installations for several buildings including DDC Control Systems for 400,000 square feet of office and lab space. BAS provides HVAC and Control Service for EMC2.
Applied Biosystems, Inc.
Framingham, MA
Installed HVAC, DDC Control of offices and a complete VAV Fume Hood Control system for 300,000 square feet. BAS provides Applied with an on site Control Technician as well as full HVAC and Control Service.
MASCO
Boston, MA
Installation of DDC Control Systems for 80,000 square feet of lab/office space. Building includes an Ice Thermal Storage System for Off Peak cooling. BAS provides full HVAC and Control Service for the building.
Wainwright Bank
Boston, MA
Installed DDC Control systems for 80,000 square feet of office and computer room space. BAS provides full HVAC and Control Service for several Wainwright Bank locations.
Pharmeco
Devens, MA
Installed VAV Laboratory Fume Hood Control System for 80,000 square feet of lab space. Includes Automatic Fume Hood Sash Positioning Systems for all Fume Hoods (Automatic closure of Hood when not being used). BAS provides ATC Control service for the site.
National Fire Protection Association
Quincy, MA
Installed DDC Control System and HVAC systems for 140,000 square feet of office space. BAS provides Control and HVAC services to NFPA.
Sheraton Four Points Hotel
Norwood, MA
Installed and renovated HVAC systems for 150,000 square feet of conference center and restaurant space and hotel rooms including full DDC control of all equipment.
North Shore Community College
Lynn/Danvers, MA
Renovate and replace existing control system to full DDC control systems. Includes 150,000 square feet classroom, office, and lab spaces for both the Lynn and Danvers campuses. Campus's HVAC DDC control systems linked to control from one front end through Ethernet.
Milford National Bank
Stoughton, MA
Installed and renovated HVAC systems for 100,000 square feet of office space. Includes DDC control systems for office and bank spaces. BAS provides full service for all HVAC and Control systems.
Stone and Webster
Stoughton, MA
Design/Build renovation of HVAC systems for 180,000 square feet of office space. BAS provides HVAC and Control service to Stone and Webster.
Northwoods Business Park
Danvers, MA
HVAC Design/Build of four office buildings totaling 480,000 square feet. Includes DDC control systems for all buildings. BAS provides HVAC and Control service for park.
Marlboro Bronx Office Park
Marlborough, MA
Design/Build HVAC and DDC Control Systems for 250,000 square feet of office space. One of the Buildings, which is 160,000 square feet, includes Ice Thermal Storage system for Off Peak cooling.
Framingham Corporate Center
Framingham, MA
Installation of DDC Control System for 250,000 square feet of office space. BAS provides Control Service for the building.
|